We knew how efficient it was to have the house built in panels but we were still astounded that in less than an hour and a half we had all exterior walls nailed in place!
.
.
Early Monday morning a truck, 1 trailer, and a truck with a crane arrived on site from the factory in Auburn. One truck had all our interior walls banded together into 2 stacks. The truck with the crane had all the miscellaneous materials from 4x6's to deck hangers. And the trailer had all the exterior walls with siding, windows, and doors already attached.
.
When everything was set, the first wall was lifted with the crane. Watch!
.
Wonders of today’s techniques, a crane, a capable operator, and hard working framers.
4 hours after the exterior walls, all interior walls were nailed into place.
.
Stay tuned!